please note readers should be aware that not all statements may be factual or correct, please verify and research independently where possible
Project Phoenix
Operator | ~75% WI (Formally Icewine East)
647 MMBO Unrisked net mean prospective oil resources1,2
Icewine East was renamed Project Phoenix to reflect the refreshed exploration strategy for this acreage. Since its acquisition in 2014, the acreage targeted the unconventional HRZ play. Project Phoenix is focused on the oil-bearing conventional reservoirs that were identified during the drilling and logging of Icewine 1 and 2 and recent offset drilling. Project Phoenix is strategically located on the Dalton Highway with the Trans-Alaskan Pipeline System running through the Acreage
18/09/2024
Significant Contingent Resource Update for Project Phoenix
https://clients3.weblink.com.au/pdf/88E/02853906.pdf
19/08/2024
PROJECT PHOENIX UPDATE
https://clients3.weblink.com.au/pdf/88E/02839855.pdf
19/04/2024
FURTHER INFORMATION ON HICKORY-1 FLOW TEST RESULTS
ANNOUNCED 2 AND 15 APRIL 2024
https://clients3.weblink.com.au/pdf/88E/02797278.pdf
15/04/2024
HICKORY-1 FLOW TEST – SECOND LIGHT OIL DISCOVERY
https://clients3.weblink.com.au/pdf/88E/02795290.pdf
02/04/2024
HICKORY-1 UPPER SFS ZONE FLOWS LIGHT OIL
https://clients3.weblink.com.au/pdf/88E/02790820.pdf
25/03/2024
Hickory-1 Flow Test Operations Update
https://clients3.weblink.com.au/pdf/88E/02788240.pdf
11/03/2024
Hickory-1 Flow Test Operations Commenced
https://clients3.weblink.com.au/pdf/88E/02783190.pdf
28/02/2024
Hickory-1 Flow Test Operations Update
https://clients3.weblink.com.au/pdf/88E/02778276.pdf
19/02/2024
Hickory-1 Flow Test Imminent – Final Preparations Underway
https://clients3.weblink.com.au/pdf/88E/02773856.pdf
05/02/2024
Hickory-1 Pre-Flow Test Operations on Track
https://clients3.weblink.com.au/pdf/88E/02769174.pdf
12/01/2024
Hickory-1 Flow Test Update
https://clients3.weblink.com.au/pdf/88E/02762057.pdf
05/12/2023
PROJECT PHOENIX – JV PARTNER UPDATE
https://clients3.weblink.com.au/pdf/88E/02750125.pdf
06/11/2023
Hickory-1: Confirmed Discovery
with BFF Maiden Contingent Resource Estimate
https://clients3.weblink.com.au/pdf/88E/02736211.pdf
30/10/2023
PROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
https://clients3.weblink.com.au/pdf/88E/02732156.pdf
12/10/2023
ALASKAN PORTFOLIO UPDATE
https://clients3.weblink.com.au/pdf/88E/02724168.pdf
21/09/2023
HICKORY-1 WELL FLOW TEST PLANNING UPDATE
https://clients3.weblink.com.au/pdf/88E/02714384.pdf
05/09/2023
HICKORY-1 WELL FLOW TEST – RIG CONTRACT EXECUTED
https://clients3.weblink.com.au/pdf/88E/02707685.pdf
http://www.allamericanoilfield.com/services/#rig-lll
23/06/2023
Hickory-1 Flow Testing Program and Post Well Analysis Update
https://clients3.weblink.com.au/pdf/88E/02678892.pdf
21/04/2023
Pantheon Resources - Implications of 88E Hickory-1 Well
https://www.lse.co.uk/rns/PANR/operational-and-corporate-update-zjlbn1wuix29tpn.html
19/04/2023
HICKORY-1 Initial Summary of Results and forward plan
https://clients3.weblink.com.au/pdf/88E/02655754.pdf
11/04/2023
Hickory-1 Well To Proceed to Flow Testing
https://clients3.weblink.com.au/pdf/88E/02652865.pdf
03/04/2023
Hickory-1 TD Reached – Additional Reservoir Identified
https://clients3.weblink.com.au/pdf/88E/02650423.pdf
10/03/2023
Hickory-1 Well Spudded
https://clients3.weblink.com.au/pdf/88E/02642264.pdf
28/02/2023
formation of the Toolik River Unit
https://clients3.weblink.com.au/pdf/88E/02637900.pdf
https://dog.dnr.alaska.gov/Document/Download/59FCA8D2D37E4D979CC0007744A55880/Toolik%20River%20Unit%20Formation%20Application%20Decision%20-%20Approval%20in%20Part%20(2023).pdf
03/01/2023
RE: LAS 34367, Accumulate Energy Alaska, Inc., Off Road Travel and Ice Construction, Five
Year Land Use Permit Approval
https**://dog.dnr.alaska.gov/Document/Download/7B96C31EF1D2498EBBB147EEC51CDFAE/LAS%2034367%20Accumulate%20Energy%20Alaska%20Inc.%20Land%20Use%20Permit%20Off-Road%20Travel%20and%20Ice%20Construction%20Approved.pdf
15/12/2022
Project Phoenix Investor Presentation
https://cl******bold textients3.weblink.com.au/pdf/88E/02612833.pdf
06/12/2022
Toolik River Unit Application
https://dog.dnr.alaska.gov/Document/Download/2EE41A1D81834BF5AA61016D48F43300/Toolik%20River%20Unit%20Public%20Notice%20App%20and%20Unit%20Agreement%20(2022).pdf
05/09/2022
Selection of Drilling Location in Icewine East following Interpretation of available 3D Seismic data set
https://clients3.weblink.com.au/pdf/88E/02563802.pdf
Application Package
https://dog.dnr.alaska.gov/Document/Download/E2866989809845F08FF38C72F947AE0/Application%20LAS%2034367.pdf
23/08/2022
Project Icewine East Prospective Resource Estimate
https://clients3.weblink.com.au/pdf/88E/02556755.pdf
10/08/2022
Project Icewine East: Maiden Independent Prospective Resource Estimate
of 1.03 Billion Barrels*
https://clients3.weblink.com.au/pdf/88E/02551494.pdf
27/06/2022
Projects Update: Icewine East & Longhorn
https://clients3.weblink.com.au/pdf/88E/02535257.pdf
09/05/2022
Project Icewine – Independent Third-Party Mapping Complete
https://clients3.weblink.com.au/pdf/88E/02519892.pdf
https://stimulationpetrophysics.com/
https://snowfallenergy.blogspot.com/p/consulting.html